Vacuum Breaker
For a perfect dosing result
Vacuum breakers are required if, after switching off the motive water supply, the vacuum exceeds 0.1 bar due to system-related conditions. The vacuum can be caused by a geodetic difference in altitude of the chlorine solution injection pointor by a vacuum in the main pipe.
For a perfect dosing result
Vacuum breakers are required if, after switching off the motive water supply, the vacuum exceeds 0.1 bar due to system-related conditions. The vacuum can be caused by a geodetic difference in altitude of the chlorine solution injection pointor by a vacuum in the main pipe.